On the Critical Path | On the Critical Path (1971) 4K FULL HD 1080p Vietsub Online miễn phí | PHIMBOP

Login

Don't have an account?

Login

Don't have an account?

List of episodes

(On the Critical Path)

Year: 1971

Runtime: 22 minutes

7.0 / 10

(1 Vote count)

Content: Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

Countries:

Canada

Genres:

Documentary

Runtime:

22 minutes

Year:

1971

Production companies:

ONF | NFB

Crews:
Dennis Sawyer

Producer

Kenneth McCready

Script

Bernard Bordeleau

Sound Editor

Movie content ⇀

Your rating
Community
- (0 ratings)

Login

Don't have an account?

Download Phimbop App

High-speed streaming, bypass ISP domain blocks

Your device

Windows

Windows 10, 11 (64-bit)

Download (.exe)

macOS

Apple Silicon & Intel

Download (.dmg)

Linux

AppImage & .deb (x64)

Download (.AppImage)

Android

Direct APK installation

Download (.apk)

Note: If your OS or browser flags an unknown publisher (SmartScreen / Gatekeeper), please select "Run anyway" to complete installation.